We began working on our new space on Flint Street in April of 2024. We’ve made a lot of progress, but there’s still more to do.
We’ve cleaned the concrete floor
We’ve built a fire wall ---
We’ve repaired most of the windows
We’ve set up the store
We’ve put up new LED lights
— with two layers of sheetrock on each side
We’ve torn down the ceiling and one of the walls in what was originally a room-sized cooler, as the ceiling had rot and the metal wall had rusted.
Metal wall being removed
We’ve rebuilt the ceiling and wall.
We’re still:
Upgrading the wiring
Upgrading the plumbing
Doing ongoing cleaning
Arranging and organizing merchandise
Raising funds for the ongoing work
We still need to:
Install a front entrance
Build a handicap ramp to the entrance
Put up signs outside & inside
Build an elevator shaft & install an elevator