Progress on our New Store

We began working on our new space on Flint Street in April of 2024. We’ve made a lot of progress, but there’s still more to do.

 We’ve cleaned the concrete floor

We’ve built a fire wall ---

We’ve repaired most of the windows

Photo of window repair

We’ve set up the store

We’ve put up new LED lights

— with two layers of sheetrock on each side

We’ve torn down the ceiling and one of the walls in what was originally a room-sized cooler, as the ceiling had rot and the metal wall had rusted.

Ceiling removal in cooler

Metal wall being removed

Wall being removed

We’ve rebuilt the ceiling and wall.

We’re still:

  • Upgrading the wiring

  • Upgrading the plumbing

  • Doing ongoing cleaning

  • Arranging and organizing merchandise

  • Raising funds for the ongoing work

We still need to:

  • Install a front entrance

  • Build a handicap ramp to the entrance

  • Put up signs outside & inside

  • Build an elevator shaft & install an elevator

Clothes on racks