Progress on our New Store
We began working on our new space on Flint Street in April of 2024. The store is now up to code and open for shoppers, but there’s still more to do.
We’ve cleaned the concrete floor
We’ve built a fire wall ---
We’ve repaired most of the windows
We’ve set up the store
We’ve put up new LED lights
— with two layers of sheetrock on each side
We’ve torn down the ceiling and one of the walls in what was originally a room-sized cooler, as the ceiling had rot and the metal wall had rusted.
Metal wall being removed
We’ve rebuilt the ceiling and wall.
We still need to:
Install a front entrance
Build a handicap ramp to the entrance
Put up signs outside & inside
Install a public bathroom
Build an elevator shaft & install an elevator to the second floor